Home / Process

How we build an ADU in Stockton

Six steps from the first call to move-in.

Two-story house under construction at dusk

Step by step

  1. Free consultationWe talk through goals, budget and what you know about the lot.
  2. Site visitWe measure, open the electrical panel, find the sewer route and photograph the yard.
  3. Design and estimateA floor plan and a written, itemized construction price.
  4. PermitExpedited review for permit-ready plans; standard review for custom plans.
  5. ConstructionFoundation to finishes, with city inspections along the way.
  6. Final and move-inFinal inspection, sign-off and a walk-through with you.

Address and utilities

Each ADU needs its own address. Separate utility connections are optional unless the design needs them.

Inspections

We schedule each city inspection as the job reaches it.

Is your lot ready for an ADU?

Send your address and a sentence about what you want. We look up the zoning, setbacks and utility routes and reply with the ADU types that fit.

We build in Stockton, CA.

We use your details only to answer this request. Your address is never published.